Sunday, November 7, 2010

Kitchen Remodel, D Day +7


It's Sunday. Last week Sunday, it was day before demolition. Since that time, the cabinets are gone, the Pergo floor is gone, the kitchen floor is gone (down to the 2x6's). Tomorrow it is hoped that the Project Manager (construction supervisor) will show up with 7 sheets of 3/8 plywood.

The plywood is for me to nail into the sub-floor (the 2x6's). This way, the laminate flooring will have a nice clean level surface to float on. This is a neat photo, it shows the plumbing, some electrical, and the bare floor. That is what will be covered with plywood.

In terms of construction day's it is +5. Weekends don't count in the schedule.