There is also a cabinet above the refrigerator. That is also in the design. Seeing these come together is a welcome sight. While the installation carpenter was working, Lowes delivered the dishwasher. It is staged in the family room next to the stove hood. There are quite a few parts needed to be installed.
Next week should be a big one. We are expecting the rest of the cabinets to be installed, the counter top to be measured, maybe the dishwasher to be installed. Other things is the tile and the flooring.
Got some painting to do tomorrow, I don't mind doing the easy stuff.
No comments:
Post a Comment