Saturday, November 27, 2010

Kitchen Remodel, D Day +27

It's Saturday and the weekend off for us and the guys. The installation carpenter worked on Friday, the day after thanksgiving. He really got a lot done. The doors are on the base cabinets and to the right of this photo are 2 pantry cabinets and the refrigerator enclosure. You heard right, a refrigerator enclosure. It was in the design, but I never would know what it would look like.

There is also a cabinet above the refrigerator. That is also in the design. Seeing these come together is a welcome sight. While the installation carpenter was working, Lowes delivered the dishwasher. It is staged in the family room next to the stove hood. There are quite a few parts needed to be installed.

Next week should be a big one. We are expecting the rest of the cabinets to be installed, the counter top to be measured, maybe the dishwasher to be installed. Other things is the tile and the flooring.

Got some painting to do tomorrow, I don't mind doing the easy stuff.

No comments: