Sunday, November 14, 2010

Kitchen Remodel, D-Day +13

This is a Sunday entry. The long awaited drywall nailing inspection happened Friday afternoon. There was no progress made other than the drywall guy's showing up at 10 am (Friday). Since no inspection, no work. But they did drop off the materials they will need tomorrow.

I suppose there was work done yesterday. The plywood under the washer and drier was removed and replaced. I'm not sure if it will be good enough for the flooring guy. I wanted a separate piece for the washer and drier. This means there is a gap between the two plywood pieces. It's not a big deal to make a correction on that. It will wait until the flooring guy takes a look and we get closer to that event. I've got extra plywood and the washer/drier will need to be moved anyway.

By the end of this coming week, I think this is what will happen: drywall is mudded / sanded; washer and drier will be framed in, having doors installed would be a plus. That is all I can think of. The cabinets might be in and those will be stored here.

No comments:

Post a Comment