Veteran's Day, one of the demo guys (utility man) came by to lay some Ram Board, a thick cardboard paper roll on the plywood floor. He came as I was just finishing up nailing down that 4X8 1/2 inch plywood. Ran out of nails, so I went to Stock Building Supplies (not sure if that is their actual name) and got another box. That Ram Board is good stuff. It will keep things clean.
Started a little after 8 am this Veterans Day morning. Once the nailing was done, I turned to part two of the day. Part two is to get the needed pieces cut to go by the sliding glass door and for the washer and drier area. Thought it best to remove the pieces that the washer and drier are removed and replace with new. So, with these pieces cut, the weekend work go much quicker. I did not do the "dog room" - yet. That is more cutting.
During these plywood cutting adventures, I've utilized the "snap a chalk line" method to give a straight line the full 8 feet of a sheet. Works out fairly well. In other news, tomorrow we hope that the city inspector will be coming by to inspect the nailing of the drywall. Then, they can seal and mud this. Then it will be very dusty for awhile. The sheet plastic with zipper door seems to be working fairly well.
My circular saw needs a new blade.
No comments:
Post a Comment