Kitchen Remodel, D Day +17


Very busy day today. The drywall guy showed up to spray the texture and the cabinets arrived. The cabinets came first. It took the unloaders several trips to get it all unloaded. By the time I got home, they were all unloaded and staged in the family room. It's like a small maze in there. There are many boxes.

The drywall guy arrived and got his gear all unloaded, this was about 1 pm. He got done and was out of here a little after 4. The bare walls have been textured and look great. Mother Nature is giving us cool (moist) weather so I got the space heater in that room to offset the cool. Hopefully it will work.

Tomorrow we hope the millwork (baseboards) will be installed and the laundry room door + jam installation (one piece). They are planning on painting as soon as possible.

Our washer and drier are not connected. We will not have these for maybe 2 days?